1.
Duan L, Feng Y. A Genetic Algorithm-Based Model for Intelligent Scheduling and Route Optimization of Construction Engineering Inspection Tasks. WSRJ. 2026;12(7):11-27. doi:10.6911/WSRJ.202607_12(7).0002