[1]
L. Duan and Y. Feng, “A Genetic Algorithm-Based Model for Intelligent Scheduling and Route Optimization of Construction Engineering Inspection Tasks”, WSRJ, vol. 12, no. 7, pp. 11–27, Jul. 2026, doi: 10.6911/WSRJ.202607_12(7).0002.